Todays update is rather short, as I "only" worked on the rotors last night.
First I did cut the blades out of 1.5mm plasticard and mounted it on a .8" tubing. Then I cut 4 rings out of 1.5mm plasticard, which will be the frame for the rotor housings. And this is their size in comparison to the chopper.